new posts

  • I had a 10ftx10ft gazebo put over the site, also cut the ceramic fibre board and CaSi boards and put them in final location. the ceramic fibre board had aluminum foil wrap put on top of it and HVAC aluminum tape on the sides, sides are picked by a needle to let any steam escape from sides (top stays sealed to prevent ceramic fibre going into hearth and cooking chamber ). I noticed the CaSi board cuts are not so difficult to dislodge from their position so I am wondering if a 1/8"-1/4" layer of refractory mortar over the CaSi top (sides kept bare) layed and let cure before any bricks put on it, will keep the boards together while constructing the bricks:

    Click image for larger version  Name:	IMG_8998-s.jpg Views:	0 Size:	1.25 MB ID:	472345
    Last edited by IH123; 07-21-2026, 03:26 PM.

    Comment


    • As posted previously a wet mortar applied over a very hygroscopic material, particularly if the layer is thin, is nigh on impossible because the moisture will be immediately sucked out of the mortar. Apart from the difficulty in obtaining a flat surface the moisture required for the hydration process will be reduced perhaps to a level which will impair strength. Most builders use a dry mix of fine sand and powdered clay. This acts as a levelling medium because there will be small variations in the thickness of the floor bricks. The dry mix also allows for free movement of individual floor bricks as they receive differing rates of thermal expansion depending on their location.

      Try your proposed method by all means, but I think you will have trouble.
      Kindled with zeal and fired with passion.

      Comment


      • I can't get CaSi glue where I live, they don't sell it, I also posted previously that I would create a slurry (much water added to mixed refractory mortar portion) and use sponge to brush the CaSi board with it, this will let the board absorb but also dry the slurry leaving those mortar little droplets waiting to bond to thicker full mortar (not diluted). as this is not structural, its just to have the following outcomes:
        1) create a rigidized 1/8" surface over board to reduce or prevent dust leaking out
        2) provide a little gluing of the boards together , just to have strength not to easily slip over aluminum sheet below it

        I could test on scrap Casi board cuts I have and see if mortar actual bonds and cures strong

        once first dome course is constructed and banded using the stainless steel banding, and with its weight, I wont worry about the boards moving under the bricks.

        I will use Band Clamp to hold the CaSi board cuts together until I finish the 1/8" coat and the dome's first course.​ regardless if the 1/8" refractory mortar becomes hard strong or not, as its going to be under play sand , if it dries and crumbles then let be, it would just be another filter of the insulation board dust​

        Comment


        • I finished today casting a thin 1/8" skim coat over the CaSi board and went smoothly: I had to wet the board with a refractory mortar slurry and then paste the refractory mortar with the wedge of rectangular trowel at about 15 degrees pressing firmly (if not pressing firmly they will like come off however magic happens when pressing firmly, they get like suction gluing to the board - like a car auto body prep), I did the top and then sides, not covering it or wetting it as soon as it cures in 24-48 hours I will build my oven on it. I used Thermobond 915, about 6kg for the top and about 1-1.5kg for sides mixed with 16% water ratio by weight, here are the pictures:


          Click image for larger version

Name:	IMG_9010-s.jpg
Views:	0
Size:	912.1 KB
ID:	472393 Click image for larger version

Name:	IMG_9011-s.jpg
Views:	0
Size:	625.9 KB
ID:	472391 Click image for larger version

Name:	IMG_9012-s.jpg
Views:	0
Size:	770.0 KB
ID:	472392

          Comment


          • That looks pretty good, well done. Because of the large amount of water applied it is advisable to allow sun and wind dry it out as much as possible before locking it in with the floor brick layer. Try and find something else to do for a couple of weeks.
            Kindled with zeal and fired with passion.

            Comment


            • Indeed, needs to dry however it will take me days-weeks to lay the dome spring line and hearth bricks, which will be laid dry except the wet from cutting and head joints:
              1) I need to smooth and re-level , at least for dome bricks foot print as the dome bricks will not have levelling play sand or mortar under them. there will be parchment paper as a slip layer but that can't level or added in layers as when it burns it could compress or dislocate. will use my laser level and grinding to level smooth(might use silicon carbide rub brick instead of angle grinder which could eat too much)
              2) vacuum all dust and debris
              3) set my wet saw, create cutting jigs (guards, mitres ,clamps,..etc)
              4) cut the bricks to shape for dome and hearth
              5) dry fit the bricks


              so all of the above will take lots of time (I work on it couple hours on some days of week so will be slow.

              here are the pictures from today (less than 12 hours from casting), no cracks or issues except lot of smoothing and levelling needed:

              Click image for larger version  Name:	IMG_9019-s.jpg Views:	0 Size:	1.14 MB ID:	472415 Click image for larger version  Name:	IMG_9022-s.jpg Views:	0 Size:	577.1 KB ID:	472414 Click image for larger version  Name:	IMG_9023-s.jpg Views:	0 Size:	956.0 KB ID:	472416 Click image for larger version  Name:	IMG_9024-s.jpg Views:	0 Size:	1.11 MB ID:	472417 Click image for larger version  Name:	IMG_9026-s.jpg Views:	0 Size:	1.22 MB ID:	472418
              Last edited by IH123; Today, 09:33 AM.

              Comment