I’ve been going stir crazy waiting since 8th to get more fire cement. My supplier, “schamotte-shop.de“ is not being transparent at all, will not answer the phone, only reply slowly to emails and will not give any commitment to when I will receive it. They have been totally unhelpful. I ordered the same product from an alternative supplier who said they could deliver within 3 days. That supplier turned out to be also owned by them, and they sent me 25kg of the wrong product. I now ordered another bag from the second supplier who apologised for sending the wrong product. That should arrive today. I have my fingers crossed that it is correct this time. 2 weeks of good weather have flown by and I have not been able to finish the dome. Very frustrating not being able to work, watching the last good weather for the year disappear.
Here are a few little things I was able to do on the oven. I also finished the terrace paving, started on the terrace gutters, and put a soak well in the front garden to catch the rain water from the roof. Not the jobs I wanted to do, but good to have them done at least.
Stainless Steel Reinforcement
I got my galvanised reinforcing braces back from the engineering shop, so I got into that. The 45° angle on the braces was not perfect for securing my bolts. I bent the stainless threaded rod to fix this, and it works well. Two stainless anchor bolts secure it to the hearth slab, with stainless threaded rod securing each brace across the top of the arch.
Arch Vent Mount
One other little job I managed to get done was to cast a vent mount on top of the arch with a 50/50 mix of fire concrete and vermiculite. It’s strong, level, and my vent cast will fit perfectly on top.
Leave a comment: