1-moisture could go up or down and the more dams I put the more focused and damaging it would become, I think I will just leave it natural for now (no vapour barrier on top slab) and would have to protect the site from downpour, rain, snow, and ice melts- I will not manage gaseous level moisture. its my first build and as long as a risk is not of high impact I will ignore it for the sake of completing and hoping the solution can be made after a problem occurs (only for low impact risks)
2-I already have the 60 bags (4000psi) in my garage wrapped with vapour barrier above ground, I have bought used 4 cu ft drum concrete mixer. I did mix 28 25kg bags for my bottom slab (6000 psi with fibre) so 30 30kg 4000psi bags wont be different. I will pour the grouts first and then after a bit of cure the top slab (not both at same time, too risky for leaks and blow outs)
2-I already have the 60 bags (4000psi) in my garage wrapped with vapour barrier above ground, I have bought used 4 cu ft drum concrete mixer. I did mix 28 25kg bags for my bottom slab (6000 psi with fibre) so 30 30kg 4000psi bags wont be different. I will pour the grouts first and then after a bit of cure the top slab (not both at same time, too risky for leaks and blow outs)





Comment